Endless Pools FastLane Manuel d'utilisateur Page 4

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 34
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 3
GROUND PREPARATION
The surface the Fastlane Pool is to be assembled on must be firm
and level. The Fastlane Pool must be installed as level as possi-
ble, within 2"- 3" of level (from the highest point to the lowest
point of the pool). If the pool will be assembled on a sloping sur-
face, be sure to install the skimmer on the lower side to ensure that
it will not suck air into the pump. If the ground is not level and it
is desired to make a more level surface, take the earth from the
high area of the uneven surface; do not add earth to the low area
of the surface. Once the surface is level, clear any debris or sharp
objects that may be uncomfortable to walk on or could become a
puncture hazard for the liner. Foam flooring may be added under
the liner for additional comfort.
The pool is comprised of various parts. Therefore, before pro-
ceeding with installation, ensure that all necessary parts for the
pool are present and group like parts together.
Part Description Quantity
(A) Liner 1
(B) Top 130cm straight tubes (wider) 6 (8 for Longer Pool)
(C) Top 60cm straight tubes (wider) 4
(D) Top corner tubes (wider) 4
(E) Bottom corner tubes (thinner) 4
(F) Straight bottom tubes (thinner) 6 (8 for Longer Pools)
(G) Struts 10 (12 for Longer Pools)
The supporting legs, or struts (Part G), support much of the weight
of the Fastlane Pool and may need additional support in “soft
ground” installations, or in areas that may experience excess
ground water. A 2"x 8" x 22" piece of lumber installed under each
strut’s base and leveled with the ground is very effective. Make
sure the entire base of each strut is on the 2" x 8" lumber as any
over-hang may result in bending of the strut. A concrete slab of
the similar dimensions may be used as well. Please note that any
support(s) added under the pool structure must be recessed so that
the top of the support is level with the ground surface. Lifting the
struts or frame in any manner may cause excessive stress on the
liner and frame, and may void the Fastlane Pool warranty. (Refer
to Diagram #1: Supporting Legs / Struts.)
DIAGRAM #1: SUPPORTING LEGS / STRUTS
POOL ASSEMBLY
1. Unfold and spread out liner (Part A) on the prepared area.
NOTE: Keep in mind the desired “swim direction” when
positioning the liner, because when the Fastlane Pool is
fully assembled, the swim direction will be headed towards
the end of the pool that has the pre-cut holes.These holes are
for the water quality thru-wall fittings and hydraulic hoses.
2. Align the struts (Part G) with the prepared cut outs at top
of liner.
3. Connect bottom tubes (Part F) to struts (Part G) one at a time to
make the four sides of the pool. Connect corner tubes (Part E) to
the open ends of both struts to finish each of the four corners.
A
B
C
D
E
F
G
3
Vue de la page 3
1 2 3 4 5 6 7 8 9 ... 33 34

Commentaires sur ces manuels

Pas de commentaire