Endless Pools FastLane Manuel d'utilisateur Page 12

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 34
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 11
Next, take the 4-1/4” long piece and glue a slip x slip 90º elbow
onto one end. At the other end of this pipe another street elbow
will be glued on, but the 2 faces of the elbows must be aligned.
This can be accomplished by placing both faces of the elbows
onto level ground immediately after the second elbow has been
glued on. This will force the elbows to be facing the same way.
Now take this assembly and glue a heater controller union half
onto the male end of the street elbow. Connect the union half to
the heater controller so that the slip x slip elbow is down and fac-
ing the under the mounting board.
Cut a length of flex PVC from the roll so that when glued into the
slip x slip elbow the opposite end of the pipe is just beyond the
base. Then glue a valve onto the end of that pipe. Finally, use the
flexible pipe to connect the valve to the return fitting union on the
pool.
Cut a 2-1/2” length of flexible PVC and glue that into the suction
fitting on the pump. Glue a valve onto that short piece of pipe.
Then glue a length of PVC between that valve and the suction fit-
ting on the pool.
FASTLANE POOL EQUIPMENT
HUTCH ASSEMBLY
1. Begin by attaching the PVC support (B) to the underside of the
lid (A). Two supports have been provided and are labeled. One
support will be for a 60hz power supply and one support will be
for a 50hz power supply. Choose the support that is appropriate
for your application. If you are unsure which power supply you
have, refer to the specification plate on the motor.
2. Next, assemble the four vertical panels. The textured side of the
panels will be facing out and each panel will be labeled on the
inside face. Panels 1 and 2 have no tabs on the vertical edges
while panels 3 and 4 do. Position the panels so that 1 is oppo-
site 2 and 3 is opposite 4. Align the holes in panels 1 and 2 with
the tabs of 3 and 4. Use the shorter screws to attach the 4 pan-
els together.
3. The underside of the lid will have 1-4 engraved on each side.
Line up the numbers on the underside of the lid with the corre-
sponding vertical panel. Use the longer screws to attach the lid
to the vertical face. Make sure that there is a cylindrical space
between the lid and the vertical face at each screw.
4. Remove the mounting bracket and adhesive protective film of
the heater controller keypad. Feed the keypad cord into the oval
hole in panel 4. Press the keypad firmly against the panel. Feed
the mounting bracket back over the keypad cord and tighten it
against panel 4.
5. Once the Water Quality System is fully assembled, place the
weather guard over the entire power unit so that the opening in
panel 2 is seated around the power unit controller.
6. Align the 3 holes in the bottom of panel 1 with the holes in the
water quality base. Use the short screws to attach the weather
guard to the base.
11
A
B
1
2
4
3
Panel 1
Panel 3
Panel 4
Panel 2
Vue de la page 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 33 34

Commentaires sur ces manuels

Pas de commentaire